Photo Library
Click here for a graphics version of this page
Click here for the first photo


|| Pyxis_Sailing | Inside_and_Out | Sails | rigging | Pyxis_On_the_Hard ||
||Cover_and_Frame | Details_and_Modifications | Repairs | CAD_Drawings ||
||Pyxis_Home_Page | Dan's_Home_Page ||

Pyxis Sailing (Graphics | Top)

Beam Reaching . . . 21K
Beam Reaching Close Up . . . 29K
Off Fairport . . . 25K
Sailing with 150 . . . 18K
Sailing with 130 . . . 8K
Sailing Working Jib . . . 10K
Surfing . . . 22K
Off the Beach . . . 22K
The Leward Rail . . . 22K
Sailing into Cleveland, OH . . . 29K

Pyxis Inside and Out (Graphics | Top)

At The Dock . . . 12K
From The Masthead . . . 41K
Aother Shot From The Masthead . . . 18K
The Cockpit . . . 20K
Main Cabin Looking Forward . . . 18K
Main Cabin Looking Aft . . . 25K
Gutted Interior . . . 17K
Companionway Step . . . 25K
Head Cover . . . 20K
Settee Lockers . . . 14K
Settee Locker Bottoms . . . 15K
Pyxis in a Blow . . . 11K

Pyxis Sails (Graphics | Top)

New Mainsail . . . 16K
Main and Working Jib . . . 10K
Main and 130% Genoa . . . 25K
Another shot of the 130 . . . 26K
150% Genoa . . . 20K
Another shot of the 150 . . . 41K
170% Genoa . . . 15K
Spinnaker . . . 21K
Sail Data

Pyxis Rigging (Graphics | Top)

Outhaul . . . 24K
Downhaul . . . 21K
Backstay Adjuster . . . 16K (NEW)
Adjustable Genoa Cars . . . 19K
New T-Track . . . 14K
Halyards . . . 18K
Masthead . . . 11K
Mast on Car for Transport . . . 30K
Mast Step . . . 16K
Halyard Slot in Masthead Piece . . . 25K

Pyxis On the Hard (Graphics | Top)

On the Cradle . . . 19K
In The Slings . . . 21K
Snowbound . . . 29K
Snowbound 2 . . . 21K

Pyxis Cover and Frame (Graphics | Top)

Cover Frame 1 . . . 13K
Cover Frame Track "Car" . . . 17K
Cover Frame Track "Cars" on track . . . 14K
Cover Frame 2 . . . 15K
Cover Frame 3 . . . 16K
Cover Frame 4 . . . 14K
Under Cover . . . 23K
Covered up for '98 . . . 17K

Pyxis Details and Modifications (Graphics | Top)

Bottom After Sandblasting . . . 32K
Top of Keel After Sandblasting . . . 19K
Bottom Before Launch . . . 15K
Seacock Installation . . . 40K
Bilge Pump Installation . . . 13K
Rudder Shaft Repair . . . 25K
Engine Well . . . 21K
Engine Well Drain . . . 16K
Under the Cockpit . . . 19K
Main Electrical Panel . . . 21K
Main Junction Box . . . 31K
2nd Battery Box . . . 15K
Wiring track in Mast . . . 13K
Headliner Wiring at Mast Step . . . 22K
Galley Locker . . . 12K
Galley Locker Removed . . . 20K
Galley Locker Expansion . . . 26K
Galley Locker Expansion in Progress . . . 17K
Galley Locker Expansion Bottom and forward Panels . . . 13K
Hanging Locker Shelf in Place . . . 21K
Hanging Locker Shelf panel . . . 12K
Keel . . . 25K

Pyxis Repairs (Graphics | Top)

See the page on the Cockpit Floor Delamination Repair for details.
Wet Core in Cockpit Floor . . . 23K
Cockpit floor section that was not wet out at OEM layup . . . 44K
Cockpit Floor Repair Area From Below . . . 26K
Rudder Tube Repair 1 . . . 17K
Rudder Tube Repair 2 . . . 23K
Rudder Tube Repair 3 . . . 16K
Cockpit Floor Repair Panel . . . 23K
Cockpit Floor Repair Panel Cross Section With OEM . . . 33K
Wetting Out Cockpit Floor Repair Panel . . . 16K
Jacking Up Cockpit Floor Repair Panel . . . 14K

Pyxis CAD Drawings (Graphics | Top)

Construction/Design Details (Graphics)
Interior Layout . . . 13K
Weekender/One Design Layout . . . 5K
Sail Plan . . . 23K
Deck Plan . . . 10K
Keel Dimensions . . . 3K
Keel Mounting . . . 5K
Rudder Assembly . . . 12K
Hull-Deck Joint . . . 7K
Wiring Track Inside Mast . . . 4K
Cradle . . . 10K
Carpet Pattern . . . 9K
Gooseneck Parts . . . 9K

Storage Space Projects (Graphics)
Head Cover . . . 12K
Cross section of Settee Locker Space . . . 6K
Cross section of Galley Locker Space . . . 8K
Hanging Locker Shelf . . . 6K
Galley Locker Bottom . . . 4K
Folding Companionway Step . . . 6K
Converting Settee to Quarter Berth . . . 11K
Converting Nav/Stove Table to Locker . . . 12K
Cooler Drawer Under Cockpit . . . 5K

Other Projects (Graphics)
Boom End Modifications . . . 15K
Engine Well Drain . . . 6K
Power Feed Panel . . . 10K
Rudder Shaft Repair . . . 6K
T-track Installation Detail . . . 4K
Rudder Tube Repair . . . 6K
Fitting a Yanmar 1GM10 under the cockpit . . . 5K
Mast Wiring Diagram . . . 5K
Tube for MOB Pole . . . 9K
Fitting a Bimini . . . 6K


All photos and drawings by Dan Pfeiffer except where noted.
|| Pyxis Home Page | Dan's Home Page ||