General
Installing hardware on the deck
Bottom Painting
Cockpit Floor Delamination Repair
Engine Well to Fuel Tank Tube
Enlarged Engine Well Drain
Keel and Keel Bolt Servicing
Seacock Installation
Speedo Impeller re-location
Forward Hatch Hinge Repair
Dual Bow Cleats
-----------------------------------------------------------
Rudder Bushings
Rudder Bushing Repair
Rudder Bushing Considerations
An Alternative Repair Method
Interior/Storage Space
Carpet Pattern
Companionway Step
Head Cover
Locker Space Behind Settee
Expanded Galley Locker Space
Shelf in Hanging Locker
V-Berth Locker
Rig and Sail Handling
New T-Track
Jib Car Modification
Outhaul Modification
Backstay Adjuster
Cam Cleats for Jib Sheets
All Rope Halyards
Converting to Internal Halyards
Self Steering Setup
Cabin Top Winch Mounting
Tuff-Luff Headfoil
|
Electrical
Re-Wiring the Mast
New Electric Panel
New Electric Junction Box
2nd Battery Box
Electric Bilge Pump Installation
Misc
On the Drawing Board
Pearson Serial Numbers
PVC Cover Frame
Pearson Models Table
Pearson 26 Time Line
Buying a P26
Spinnaker Setup
Singlehanding
Taking Boat Photos
Tuning in the Coast Guard
Sailboat Design Ratios
Guest Contributors
Project descriptions from other P26 owners...
----------------------------------------------
|
|